Home Working Groups Surface Water Working Group (SWWG)
Surface Water Working Group (SWWG) Print E-mail

 

The Surface Water Working Group is tasked with:

  • developing a recommendation for the lower Athabasca River Phase 2 Water Management Framework,
  • establishing the in-stream flow needs of the lower Athabasca River,
  • defining indicator criteria and thresholds of the lower Athabasca River used in managing activities to ensure watershed integrity, and
  • communicating information on surface water quantity to the public.

Committee Members

  • Program Manager
    Melanie Dubois
    Phone: (780) 799-3970
    Fax: (780) 714-3081
    This e-mail address is being protected from spambots. You need JavaScript enabled to view it